This information is added by users of ASN. Neither ASN nor the Flight Safety Foundation are responsible for the completeness or correctness of this information.
If you feel this information is incomplete or incorrect, you can
submit corrected information.
Date: | Sunday 11 September 2016 |
Time: | 11:40 LT |
Type: | Airbus A320-214 |
Owner/operator: | Air France |
Registration: | F-HBNK |
MSN: | 5084 |
Year of manufacture: | 2012 |
Engine model: | CFMI CFM56-5B4/P |
Fatalities: | Fatalities: 0 / Occupants: 159 |
Other fatalities: | 0 |
Aircraft damage: | None |
Category: | Accident |
Location: | Bastia-Poretta Airport, Haute-Corse 2B -
France
|
Phase: | Standing |
Nature: | Passenger - Scheduled |
Departure airport: | |
Destination airport: | Bastia Airport (BIA/LFKB) |
Investigating agency: | BEA |
Confidence Rating: | Information verified through data from accident investigation authorities |
Narrative:After the aircraft had come to a standstill on the apron, the ramp agent positioned the chocks on the nose landing gear and then on the main left landing gear after engine shutdown and informed the crew of these actions via the ground interphone connection. The crew informed him that the parking brake was released. The ramp agent checked that the aircraft was stabilized, reported this to the crew and authorized the ground support equipment to be brought forward and the docking of the jetways.
He went to the Ground Power Unit (GPU) whose engine was already in operation, picked up the connecting cable and got ready to connect the ground power connector to the aircraft. As the cable was tangled up, he was not able to do this and asked a ground attendant to untangle it. He then connected the ground power connector to the aircraft. At this moment, witnesses heard an explosion, the ground attendant saw an electric arc of around 30 cm at the connector and the ramp agent was thrown to the ground. The connector stayed connected to the aircraft.
The ramp agent was quickly cared for by the emergency services. The diesel engine of the ground power unit was shutdown.
Accident investigation:
|
| |
Investigating agency: | BEA |
Report number: | |
Status: | Investigation completed |
Duration: | 1 year and 4 months |
Download report: | Final report |
|
Sources:
BEA
Revision history:
Date/time | Contributor | Updates |
22-Jan-2018 18:28 |
harro |
Added |
The Aviation Safety Network is an exclusive service provided by:
CONNECT WITH US:
©2024 Flight Safety Foundation